Israel Railways – Grade Separation 14 – Dor/Nahsholim BR-18
Grade separation between access road to Dor-Nahsholim coast and the Tel Aviv-Haifa railroad.
The grade separation will be executed by lowering the road level below the existing grade and the railroad will continue on grade.
The construction is done in the following phases: Underground passage for the cars, ground water lowering including recharge by injection to aquifer, pump station for draining the underpass, upgrading the surrounding roads, removal of existing infrastructure, lighting fixtures and poles, landscaping.
The project schedule included cease of train transportation for 8 days only.
Dor Nahsholim
Israel Railways
Gronner DEL Engineers ltd
$15 million
2018-2022